Offshore Windfarm Installation Engineer (3rd) – Shipboard

Company: V.Group
Apply for the Offshore Windfarm Installation Engineer (3rd) – Shipboard
Location: London
Job Description:

V.Group seeks a 3rd Engineer for Windfarm Installation Unit to support shipboard operations. The role is a contract assignment on windfarm installation vessels, situated in UK waters. The engineer must hold WTIV/Jack-up offshore experience and relevant safety certificates to operate on board with a disciplined approach to offshore routines.

Joining date is 16 December 2026, with a 3-week window (+/- 1 week). The position requires UK location and shipboard duty, reporting to the Engine Department.

#J-18808-Ljbffr…

Posted: October 17th, 2026